page top

Burlington Streets: Lakeside Ave

Add to bookbag Add to Bookbag | Bookbag (0)

Item Description

Title: Burlington Streets: Lakeside Ave

Photographer

  • McAllister, L. L. (Louis L.), 1877-1963

Source Document

Extent: 1 image

Date Created: 1945 - November , 12

Description

December 11, 1945. City of Burlington, Vermont, Street Department. Lakeside Ave. Pavement Base Construction. This view was taken from a point near the intersection of Conger Ave. looking westerly towards the lake. Note that the temporary wearing surface had been constructed for the base after the work of mixing and stabilizing the base had been completed as shown in the picture under date Dec. 5, 1945. This stage of construction was done to enable the street to be used during the winter and early spring without experiencing the troubles of early spring break-up of the old dirt and cinder street. The pavement will be completed in the summer of 1946. Note the crushed stone base placed in the driveway after regrading to meet new grades.

Subject/topic

Subject/geographic

Subject/name

Note [Digital Version]

2007-12-21, Center for Digital Initiatives, University of Vermont Libraries

Type of Resource: still image

Parent Collections

Access Conditions

For usage rights related to this resource please visit: http://cdi.uvm.edu/rights/
More information.

Permanent Link:

http://cdi.uvm.edu/collections/item/mcalA05F11i03

Preferred citation

Burlington Streets: Lakeside Ave, Louis L. McAllister Photographs, Box A05, Folder 11, Item 03, http://cdi.uvm.edu/collections/item/mcalA05F11i03 (accessed November 26, 2014)

Add a comment:

*

* Optional

User Comments