Search results
(1 - 4 of 4)
- Title
- Burlington Streets: Lakeside Ave
- Description
-
December 11, 1945. City of Burlington, Vermont, Street Department. Lakeside Ave. Pavement Base Construction. This view was taken from a point near the intersection of Conger Ave. looking westerly towards the lake. Note that the temporary wearing surface had been constructed for the base after the...
Show moreDecember 11, 1945. City of Burlington, Vermont, Street Department. Lakeside Ave. Pavement Base Construction. This view was taken from a point near the intersection of Conger Ave. looking westerly towards the lake. Note that the temporary wearing surface had been constructed for the base after the work of mixing and stabilizing the base had been completed as shown in the picture under date Dec. 5, 1945. This stage of construction was done to enable the street to be used during the winter and early spring without experiencing the troubles of early spring break-up of the old dirt and cinder street. The pavement will be completed in the summer of 1946. Note the crushed stone base placed in the driveway after regrading to meet new grades.
Show less
- Title
- Sewer Projects
- Description
-
April 5, 1932. A major sewer project is underway as seen here with flat metal posts and timbers forming the walls of a large trench. View of the Lake Champlain water front with the break water in the background.
- Title
- Sewer Projects
- Description
-
February 19, 1932. Members of a crew dig with pick axes at a sewer project site near the Burlington Lake Champlain water front.
- Title
- Sewer Projects
- Description
-
March 9, 1932. A large crane is positioned in the center of the photo at a major sewer project site. The Burlington break water can be seen in the background.