Search results
(1 - 20 of 65)
Pages
- Title
- Basin below Falls
- Title
- Buildings: Unidentified
- Date Created
- undated
- Description
-
Brick building on rocks
- Title
- Buildings: Unidentified
- Date Created
- undated
- Description
-
White factory building with clerestory windows in winter landscape. See also mcalB10F25i03
- Title
- Burlington Airport
- Date Created
- undated
- Description
-
Long distance view of three main buildings at the Burlington Municipal Airport. On the left the Northeast Airlines, Inc, in the center, hangar with arched sign stating the name of the airport, to the right, probably the administration building. Beacon tower in the background on the right, wind...
Show moreLong distance view of three main buildings at the Burlington Municipal Airport. On the left the Northeast Airlines, Inc, in the center, hangar with arched sign stating the name of the airport, to the right, probably the administration building. Beacon tower in the background on the right, wind sock flies from top of center building.
Show less
- Title
- Burlington Airport
- Description
-
City of Burlington, Vermont, Street Department Municipal Airport. This view taken March 7, 1945, shows all the Municipally owned buildings including:- Hangar, metal 60' X 80' Hangar, wooden 80' X 100' Administration Building, concrete cinder block with stucco surface, housing the offices of the...
Show moreCity of Burlington, Vermont, Street Department Municipal Airport. This view taken March 7, 1945, shows all the Municipally owned buildings including:- Hangar, metal 60' X 80' Hangar, wooden 80' X 100' Administration Building, concrete cinder block with stucco surface, housing the offices of the Colonial Airlines, North East Airlines, U.S. Weather Bureau, U.S. Customs, U.S. Immigration, Civil Aeronautics Association Instrument room; Traffic Tower, wooden, erected by the C.A.A in connection with the operating of the Student Army Air Corps Flight School. The hard surface taxi-area in front of the buildings was constructed with American Bitumuls Stabilized Base and Bitumuls Emulsion Penetration Armor Coat. This work was completed in 1935 and retreated in 1939.
Show less
- Title
- Burlington Airport
- Description
-
City of Burlington, Vermont - Municipal Airport Photo dated Oct. 6, 1944. This view shows the form work for the north wall of the concrete foundation walls being constructed by Street Department forces for the resetting of the metal hangar just south of the wooden hangar. A contract was awarded...
Show moreCity of Burlington, Vermont - Municipal Airport Photo dated Oct. 6, 1944. This view shows the form work for the north wall of the concrete foundation walls being constructed by Street Department forces for the resetting of the metal hangar just south of the wooden hangar. A contract was awarded to the Street Department to build these foundation walls including all materials, labor and equipment for the sum of $1500.00. Construction workers, wooden planks for getting up to and down from the main platform and vehicles can be seen.
Show less
- Title
- Burlington Airport
- Description
-
City of Burlington, Vermont - Municipal Airport Photo dated Oct. 11, 1944. This view shows the open metal hangar together with timber bracing used in strengthening and supporting the structure while being moved from its original position to the new foundations. This view is taken from a point...
Show moreCity of Burlington, Vermont - Municipal Airport Photo dated Oct. 11, 1944. This view shows the open metal hangar together with timber bracing used in strengthening and supporting the structure while being moved from its original position to the new foundations. This view is taken from a point just easterly of the new location after the rolls and timber had been changed to roll the hangar directly westward on its new foundation. An airplane sits to the left.
Show less
- Title
- Burlington Airport
- Description
-
City of Burlington, Vermont - Municipal Airport Photo dated : Sept. 12, 1944. This view is a panorama of the entire frontage of the Airport building facilities including the wooden hangar on the left, the metal hangar and Administration Building in the center and the traffic control tower at the...
Show moreCity of Burlington, Vermont - Municipal Airport Photo dated : Sept. 12, 1944. This view is a panorama of the entire frontage of the Airport building facilities including the wooden hangar on the left, the metal hangar and Administration Building in the center and the traffic control tower at the right as it appeared from a point near the westerly edge of the north-south runway, before starting the project of removing and resetting the metal hangar to provide space for the construction of the new south wing on the Administration Building. McAllister's name embossed in the lower right just above date.
Show less
- Title
- Burlington Airport
- Description
-
This 1935 photo shows a utility vehicle with driver applying seal coat on taxi strip at Burlington Municipal Airport using 1/4 gallon per square yard of Colas Quick Breaking Emulsion and sanding lightly. Hangar in the background. Date handwritten in bottom right corner "Nov. 1, 1935."
- Title
- Burlington Airport
- Date Created
- undated
- Description
-
Long distance view of three main buildings at the Burlington Municipal Airport. On the left the Northeast Airlines, Inc, in the center, hangar with arched sign stating the name of the airport, to the right, probably the administration building. Beacon tower in the background on the right, wind...
Show moreLong distance view of three main buildings at the Burlington Municipal Airport. On the left the Northeast Airlines, Inc, in the center, hangar with arched sign stating the name of the airport, to the right, probably the administration building. Beacon tower in the background on the right, wind sock flies from top of center building.
Show less
- Title
- Burlington Airport
- Description
-
City of Burlington, Vermont - Municipal Airport Photo dated Sept 12, 1944. McAllister's name embossed in lower right just above date. This view shows the Administration Building in center with metal hangar to the right and traffic control tower to the left as seen from the parking area just...
Show moreCity of Burlington, Vermont - Municipal Airport Photo dated Sept 12, 1944. McAllister's name embossed in lower right just above date. This view shows the Administration Building in center with metal hangar to the right and traffic control tower to the left as seen from the parking area just westerly of the entrance gate before removing the metal hangar and starting construction work on the north wing.
Show less
- Title
- Burlington City Hall Park
- Description
-
City Hall Park, Burlington, fountain and elm trees looking toward College Street. To the extreme right is the Chittenden County Trust bank. Undated but may be late 1930s.
- Title
- Burlington Dump
- Description
-
August 3, 1944. This view taken from a point on North Ave. over the tunnel shows the panoramic of the entire Cat's Island Area including the dumping area, the Salvage Depot and tool shack and the road leading up the grade to the intersection of North Bend and St. Louis Streets. Note the Central...
Show moreAugust 3, 1944. This view taken from a point on North Ave. over the tunnel shows the panoramic of the entire Cat's Island Area including the dumping area, the Salvage Depot and tool shack and the road leading up the grade to the intersection of North Bend and St. Louis Streets. Note the Central Vermont Railroad tracks to the left and the power line leading to the substation of the City Electric Light Plant.
Show less
- Title
- Burlington Lakefront
- Description
-
View of the Burlington lake front looking out over a brick building with smokestack toward the breakwater where a boat is approaching. Railroad cars and tracks are also pictured.
- Title
- Burlington Lakefront
- Description
-
February 21, 1944. This view shows the dumping area at the foot of College St. in front of the Central Vermont Freight House. The snow dumped the night before was being bulldozed over the front of the dock into the lake when this picture was taken. Several thousand cubic yards of snow were dumped...
Show moreFebruary 21, 1944. This view shows the dumping area at the foot of College St. in front of the Central Vermont Freight House. The snow dumped the night before was being bulldozed over the front of the dock into the lake when this picture was taken. Several thousand cubic yards of snow were dumped at this point during the winter.
Show less
- Title
- Burlington Sand and Gravel Plant
- Description
-
Burlington Sand and Gravel Plant structures in Williston Undated but may be the 1930s
- Title
- Burlington Sand and Gravel Plant
- Description
-
Structures at the Burlington Sand and Gravel Plant in winter
- Title
- Burlington Sand and Gravel Plant (4X5)
- Description
-
Structures and the Burlington Sand and Gravel Plant in Williston
- Title
- Burlington Street Department Buildings (Pine Street)
- Description
-
Burlington Street Department, Burlington, Vt. This view shows the triangular area at the Central Plant yard from which the old Robinson-Edwards Lumber Co. building was removed and rebuilt. Note the Street Department flagpole with the United States Flag and the Minute Man Flag as a reward for the...
Show moreBurlington Street Department, Burlington, Vt. This view shows the triangular area at the Central Plant yard from which the old Robinson-Edwards Lumber Co. building was removed and rebuilt. Note the Street Department flagpole with the United States Flag and the Minute Man Flag as a reward for the 100% Department cooperation in the buying of war stamps and bonds by its employees.
Show less
- Title
- Burlington Street Department Buildings (Pine Street)
- Description
-
Burlington Street Department, Burlington, Vt. This view shows the triangular area at the Central Plant yard from which the old Robinson-Edwards Lumber Co. building was removed and rebuilt as it is shown in the background. Note the Street Department flagpole with the United States flag and the...
Show moreBurlington Street Department, Burlington, Vt. This view shows the triangular area at the Central Plant yard from which the old Robinson-Edwards Lumber Co. building was removed and rebuilt as it is shown in the background. Note the Street Department flagpole with the United States flag and the Minute Man flag as a reward for 100% Department cooperation in the buying of war stamps and bonds by its employees.
Show less