Search results
(1 - 5 of 5)
- Title
- Burlington Street Department Buildings (Pine Street)
- Description
-
July 20, 1934. P.W.A. PROJECT No. 2215 A view of the Central Plant showing the west and south elevations and looking easterly.
- Title
- Burlington Street Department Buildings (Pine Street)
- Description
-
Central Plant building of the Burlington Street Department
- Title
- Burlington Streets: Pine St.
- Description
-
Undated photo. 1943? Pine Street - Street Improvements. This view shows Pine street looking south from the intersection of Morse Place after the rough grading and the sewer construction of the Telfold Stone Base on a sand cushion had been completed during the winter months and a layer of crushed...
Show moreUndated photo. 1943? Pine Street - Street Improvements. This view shows Pine street looking south from the intersection of Morse Place after the rough grading and the sewer construction of the Telfold Stone Base on a sand cushion had been completed during the winter months and a layer of crushed stone had been spread over the Telfold Base and Wearing Surfaces will be done during the summer season of 1943. Final work of grading the shoulders and sidewalk area will be done as soon as the pavement construction is completed. Railroad tracks to the right.
Show less
- Title
- Burlington Streets: Pine St.
- Description
-
September 15, 1944. Pine Street Project, D.A. - W.I. No. 4, Burlington, Vermont. (Defense Area - War Industry No. 4) This project financed by the Federal Government as an Access Highway to a Defense Plant was handled and supervised through the Vermont State Highway Department. The construction...
Show moreSeptember 15, 1944. Pine Street Project, D.A. - W.I. No. 4, Burlington, Vermont. (Defense Area - War Industry No. 4) This project financed by the Federal Government as an Access Highway to a Defense Plant was handled and supervised through the Vermont State Highway Department. The construction work was done under contract by D. W. Overocker, General Contractor of Burlington, Vermont. The Pine Street Section of the Project consisted primarily of: - (a) Furnished and placed gravel base approximately 12 inches in depth over the entire length of this section from Howard Street to Flynn Ave. (b) Excavating sections near the intersection of Howard Street including the railroad crossing, the intersection of Lakeside Ave. and the intersection at Flynn Ave. where-ever the old pavement would not permit a minimum depth of 12 inches. (c) Furnishing and installing drainage pipes and constructing catch basins and cross culverts for surface drainage. (d) Constructing 3 inch mixed-in-place asphalt pavement 24 feet in width with 5 foot gravel shoulder on either side. (e) Reconstructing railroad crossing to Tuletex Plant (at expense of E. B. and A. C. Whiting Co.). This view shows item (e) railroad crossing during construction. Note 12 inch depth of forms placed on top of surface of old pavement and new rails and ties placed on top of old crossing which was left in place. Concrete was poured in one pouring with 12 inch depth. Note extra rail placed on side of main rail for flanfe protection. This view was taken from a point on the center line of Pine Street looking south just before the completion of placing of the concrete.
Show less
- Title
- Burlington Streets: Staniford Road (4X5)
- Description
-
November 5, 1941. This view was taken from the railroad crossing at the westerly end of the street approximately on the centerline looking easterly before any improvements were made. Another picture will be taken at a later date to compare the conditions before and after the improvements done by...
Show moreNovember 5, 1941. This view was taken from the railroad crossing at the westerly end of the street approximately on the centerline looking easterly before any improvements were made. Another picture will be taken at a later date to compare the conditions before and after the improvements done by the Burlington Street Dept.
Show less