Search results
(41 - 60 of 211)
Pages
- Title
- St. Francis Xavier
- Date Created
- 1953
- Description
-
1953 St. Francis Xavier graduating class gathered outside the school in cap and gown. Located in Winooski, Vt. Photo 3.
- Title
- St. Francis Xavier
- Date Created
- 1951
- Description
-
1951 St. Francis Xavier graduating class gathered outside the school in cap and gown. Located in Winooski, Vt. Photo 1.
- Title
- St. Francis Xavier
- Date Created
- 1950
- Description
-
1950 St. Francis Xavier graduating class gathered outside the school in cap and gown. Located in Winooski, Vt. Photo 2.
- Title
- St. Francis Xavier
- Date Created
- 1951
- Description
-
1951 St. Francis Xavier graduating class gathered outside the school in cap and gown. Located in Winooski, Vt. Photo 3.
- Title
- St. Francis Xavier
- Date Created
- 1950
- Description
-
1950 St. Francis Xavier graduating class gathered outside the school in cap and gown. Located in Winooski, Vt. Photo 3.
- Title
- St. Francis Xavier
- Date Created
- 1953
- Description
-
1953 St. Francis Xavier graduating class gathered outside the school in cap and gown. Located in Winooski, Vt. Photo 2.
- Title
- Winooski
- Description
-
View of the Brunswick on Main Street, Winooski, Vermont with a sign advertising a pool room. A mailbox is out front. Another sign lets people know that a telephone is available. And a gas pump is seen to the right. 1930s?
- Title
- Winooski
- Description
-
1928 view of Main Street, Winooski, Vermont with buildings and concrete or cement walls near embankment of the Winooski River. In center background is the Brunswick Hotel.
- Title
- Winooski (4X5)
- Description
-
View of buildings on Main Street, Winooski, Vermont near the bridge (that would be to the left). Johnson Grain Company building to the extreme left (slogan Pillsbury's Best near the top). Fence damage seen to the left.
- Title
- Winooski Bridge
- Description
-
August 24, 1945. This view was taken from the Burlington end of the bridge looking northerly. Note the asphalt construction crew placing the 2 inch hot plant mix asphalt wearing surface on the westerly half of the bridge while the other half is being used for two way traffic. This wearing surface...
Show moreAugust 24, 1945. This view was taken from the Burlington end of the bridge looking northerly. Note the asphalt construction crew placing the 2 inch hot plant mix asphalt wearing surface on the westerly half of the bridge while the other half is being used for two way traffic. This wearing surface was placed 2 inches in thickness and tapered off on to the approaches at each end. The cost of this work was borne by the City of Winooski and City of Burlington sharing in the proportion of the grand list of each City and the State Highway Department. The State Highway Department paid for 4/5 of the total cost while the other fifth was divided between the two cities.
Show less
- Title
- Winooski Bridge
- Description
-
View of the Winooski Bridge with trolley tracks in the pavement looking up Colchester Ave. on the Burlington side. Lower Winooski Road (Riverside Ave) bears to the right.
- Title
- Winooski Bridge
- Description
-
June 2, 1943. This view shows the entire width of the track area being removed and replaced with cement concrete. The steel cross ties and tie rods were removed as salvage by breaking the slab with the aid of jackhammers and special pulling methods.
- Title
- Winooski Bridge
- Description
-
August 24, 1945. This view was taken from the Winooski end of the bridge looking toward Colchester Ave. hill. Note the completed hot plant mix wearing surface on the right half of the bridge (asphalt spreader and roller shown in the distance) while two way traffic is suing the left half of the...
Show moreAugust 24, 1945. This view was taken from the Winooski end of the bridge looking toward Colchester Ave. hill. Note the completed hot plant mix wearing surface on the right half of the bridge (asphalt spreader and roller shown in the distance) while two way traffic is suing the left half of the bridge. The crew in the left foreground is removing the old cold-patch aprons which were temporarily placed near the newly installed steel expansion lanes during the previous season. This wearing surface was placed 2 inches in thickness and tapered off on to the approaches at each end. The cost of this work was borne by the City of Winooski and City of Burlington sharing in the proportion of the grand list of each City and the State Highway Department. The State Highway Department paid for 4/5 of the total cost while the other fifth was divided between the two cities.
Show less
- Title
- Winooski Bridge
- Description
-
June 3, 1943. This view shows a close-up of the "A" frame and special attachment for a "rolling pull". In removing the (trolley track) rails on this project without the aid of a cutting torch and with very little damage to the pavement.
- Title
- Winooski Bridge (4X5's)
- Description
-
View of the Winooski Bridge looking toward the Champlain Mill and showing the rocky ledges and water falls of the Winooski River. Undated but may be 1928.
- Title
- Winooski Bridge (4X5's)
- Description
-
View of the Winooski Bridge as seen from the falls of the Winooski River. Champlain Mill is seen to the left. Undated but may be 1928.
- Title
- Winooski Bridge (4X5's)
- Description
-
November 26, 1928. The new Winooski Bridge taken from Winooski lower Road (i.e. Riverside Ave).
- Title
- Winooski Bridge (4X5's)
- Description
-
December 15, 1928. View of the Winooski Bridge over the Winooski River. To the far left is the Champlain Mill and to the right is the Chace Mill factories.
- Title
- Winooski Bridge (4X5's)
- Description
-
November 26, 1928. New Winooski Bridge taken from corner of Barrett St. and Colchester Ave. Overhead trolley lines and trolley tracks in the pavement can be seen.
- Title
- Winooski Bridge (4X5's)
- Description
-
1928 view of the Winooski Bridge from the falls in the Winooksi River. To center left is the Champlain Mill.