- Burlington Streets: Hayward St. & Hayward St. Sewer
- Description
-
December 9, 1942. Hayward Street Looking Northerly from the Intersection of Catherine Street.This view shows Hayward Street looking northerly from the intersection of Howard Street. Note that curb construction is continuing through cold weather in order to put the street in passable condition to...
Show moreDecember 9, 1942. Hayward Street Looking Northerly from the Intersection of Catherine Street.This view shows Hayward Street looking northerly from the intersection of Howard Street. Note that curb construction is continuing through cold weather in order to put the street in passable condition to leave for the winter. Final surfacing is to be done in the spring.
Show less
- Title
- Burlington Streets: Howard St.
- Description
-
July 26, 1945. Howard Street Pavement and Sidewalk Project. This view was taken at the intersection of Pine Street looking easterly shows the excavation being made to receive the sand cushion and telford stone base. Note the condition of the old curb and gutter and sidewalk on the northerly side...
Show moreJuly 26, 1945. Howard Street Pavement and Sidewalk Project. This view was taken at the intersection of Pine Street looking easterly shows the excavation being made to receive the sand cushion and telford stone base. Note the condition of the old curb and gutter and sidewalk on the northerly side of the street, and the undertile drain being laid in the center of the street near the power shovel. Undertile drainage was also laid on both sides of the street back of the curb to provide proper drainage. The sub-base was soft blue clay and very unstable and full of moisture. It was necessary to stabilize this sub-base by mixing a layer of sand with the clay and treating with asphalt emulsion before the sand cushion and Telford Base could be placed as trucks could not pass over the base with a load of material without getting stuck.
Show less
- Title
- Burlington Streets: Howard St.
- Description
-
November 9, 1945. Howard Street Pavement and Sidewalk Project. This view was taken at the intersection of Pine Street looking easterly. Note the new concrete sidewalk on north side and new integral concrete curbs and gutters on both sides of pavement. The Hot Plant Mix Asphalt Wearing Surface was...
Show moreNovember 9, 1945. Howard Street Pavement and Sidewalk Project. This view was taken at the intersection of Pine Street looking easterly. Note the new concrete sidewalk on north side and new integral concrete curbs and gutters on both sides of pavement. The Hot Plant Mix Asphalt Wearing Surface was just being completed when this picture was taken. Grading has been completed between sidewalk and curb on north side.
Show less
- Title
- Burlington Streets: Pine St.
- Description
-
December 9, 1942. Lower Pine Street looking south from the intersection of Morse Place. This view shows lower Pine Street after underground work including gas main, water main and sewer main had been completed and excavation for telfold stone base was being done. A considerable amount of boulders...
Show moreDecember 9, 1942. Lower Pine Street looking south from the intersection of Morse Place. This view shows lower Pine Street after underground work including gas main, water main and sewer main had been completed and excavation for telfold stone base was being done. A considerable amount of boulders and rock excavation was necessary in widening and relocating the limits of the street.
Show less
- Title
- Burlington Streets: Pine St.
- Description
-
December 9, 1942. Lower Pine Street looking northerly from the intersection of Home Ave. The excavation for telfold stone base had been completed on the easterly half of the street at the time this picture was taken. The base course will be completed and allowed to receive traffic for several...
Show moreDecember 9, 1942. Lower Pine Street looking northerly from the intersection of Home Ave. The excavation for telfold stone base had been completed on the easterly half of the street at the time this picture was taken. The base course will be completed and allowed to receive traffic for several months before constructing the wearing surface.
Show less
- Title
- Burlington Streets: Riverside Ave.
- Description
-
Undated photo (1929 or early 1930s?) of intersection of Barrett St and Riverside Ave showing road construction project by the city street dept.
- Title
- Burlington Streets: Riverside Ave.
- Description
-
Undated photo (1929 or early 1930s?) of Riverside Ave repaving construction project by the city street dept. View is from the intersection of Barrett and Riverside looking west back toward Burlington.
- Title
- Burlington Streets: Winooski Ave.
- Description
-
South Winooski Ave at the corner of Bank Street as indicated by the street sign stating Bank St. Piles of dirt are heaped onto the greenbelt (tree belt) as street dept crew do work. To the right can be seen the steeple and front columns of the First Congregational Church on So. Winooski Ave.