Search results
(1 - 20 of 22)
Pages
- Title
- Burlington Streets: Riverside Ave.
- Description
-
Undated photo (1929 or early 1930s?) of timber barrier constructed along embankment of Riverside Ave. Billboards are seen across the road. One advertises a new two-door sedan at a new lower price. To the right is the Fairview Garage filling station at 110 Riverside Ave.
- Title
- Burlington Streets: Main Street (Upper)
- Description
-
Undated view of upper Main Street. Open landscape not yet developed.
- Title
- Burlington Streets: Pine St.
- Description
-
November 9, 1945. Pine Street Pavement Project, Federal Aid No. DA - WI 4 This view taken from the intersection of Flynn Ave. looking north was taken after the completion of the Hot Plant Mix Wearing Surface.
- Title
- Burlington Streets: Main Street (Upper)
- Description
-
November 27, 1934 view of upper Main Street looking west from East Avenue. Photo #15A 11-27-34 NRM Project #60B. Construction completed. To the left is a sign advertising Shell Motor Oil. To the right are business, town and directional signs. One sign advertises Hotel Van Ness.
- Title
- Burlington Streets: Riverside Ave.
- Description
-
Undated view of Riverside Ave (1929 or early 1930s?) and an embankment sloping down from it. A timber barrier has been constructed. The Riverside Service Station selling Socony gasoline is seen in the upper right corner. See also mcalA06F13i09 for another view.
- Title
- South Burlington, Vermont
- Description
-
View of portion of a road in South Burlington with telephone poles on one side, trees lining the other side and several buildings, barns and sign advertising camps.
- Title
- Burlington Streets: Main Street (Upper)
- Description
-
September 1, 1933 photo of upper Main Street looking east from opposite farm buildings before widening and resurfacing of the road by the Burlington Street Dept.
- Title
- Burlington Streets: Willard Street
- Description
-
June 29, 1929 South Willard Street looking south from Spruce Street as road work started June 21, 1929 by the Burlington Street Dept.
- Title
- Burlington Streets: Willard Street
- Description
-
October 19, 1929. View of So. Willard Street at the intersection of Spruce Street probably after completion of road work done by the Burlington Street Dept. that was begun June 29th of that year. See photo taken earlier : ID No. mcalA07F07i07.
- Title
- Burlington Streets: Prospect Street
- Description
-
December 7, 1932. View of portion of Prospect Street.
- Title
- Burlington Streets: Intervale Rd.
- Description
-
Undated but may be Nov. 1928 view of flood damage to Intervale Road caused by Nov. 4, 1927 flood before construction was started in 1928.
- Title
- Burlington Streets: Intervale Rd.
- Description
-
Undated photo but may be Nov. 1928 view of flood damage to Intervale Road caused by Nov. 4, 1927 flood before construction was started in 1928.
- Title
- Burlington Streets: Intervale Rd.
- Description
-
November 26, 1928. Washout on Intervale Road caused by the flood of Nov. 4, 1927 as it looked just before starting work of construction of new road Nov. 1928.
- Title
- Burlington Streets: Intervale Rd.
- Description
-
November 26, 1928. Washout on Intervale Road caused by flood of Nov. 4, 1927 as it looked just before starting work of construction of new road Nov. 1928.
- Title
- Burlington Streets: Home Ave.
- Description
-
April 14, 1934. Photo #13. City of Burlington, Vermont Federal Project P.W.A. Sewer Project No. 2353. Sewer construction - Home Ave. looking East from intersection of Richardson St. showing rock excavation. Note number of boulders encountered in this section in addition to ledge. The trench has...
Show moreApril 14, 1934. Photo #13. City of Burlington, Vermont Federal Project P.W.A. Sewer Project No. 2353. Sewer construction - Home Ave. looking East from intersection of Richardson St. showing rock excavation. Note number of boulders encountered in this section in addition to ledge. The trench has standing water in it as the men do their work. Black metal lunch boxes are gathered on some of the boulders on the right. Dirt roads still evident in mud season.
Show less
- Title
- Burlington Streets: Cliff Street
- Date Created
- 1938
- Description
-
1938 construction of Cliff Street in Burlington. The road surface has been covered with crushed stone and leveled. View is looking down the hill. McAllister studio name embossed.
- Title
- Burlington Streets: Cliff Street
- Date Created
- 1938-02-26
- Description
-
Construction of Cliff Street looking up the hill. Workers stand in a wide trench. Scattered rocks in the foreground. Date on photo Feb. 26, 1938.
- Title
- Burlington Streets: Cliff Street
- Date Created
- 1938-02-26
- Description
-
Construction crew on Cliff Street as the men work in a wide trench dealing with the rocks. Truck seen center. View looking up the hill probably from So. Willard. Date Feb. 26, 1938.
- Title
- Burlington Streets: Cliff Street
- Date Created
- 1938-02-26
- Description
-
Construction crew digging on Cliff Street in Burlington in this Feb. 26, 1938 photo.
- Title
- Burlington Streets: Cliff Street
- Date Created
- 1938-07-27
- Description
-
July 27, 1938. Construction of Cliff Street in Burlington. The construction crew has prepared the road bed with crushed stone. Wooden stakes mark the center. View is looking up the hill. McAllister studio name embossed.