- Burlington Streets: Ledge Road
- Description
-
Dated photo may be Feb. 1935. V.E.R.A. Sewer Project. Looking East on Ledge Road. Note the amount of rock excavation and the old 8" sewer pipe which is to be replaced with 15" pipe.
- Title
- Oil Tank Construction
- Description
-
July 15, 1952 oil tank construction by C. A. Congdon Construction. Workmen on site. Location may be Burlington water front.
- Title
- Oil Tank Construction
- Description
-
July 15, 1952. Crew members of C. A. Congdon Construction building oil tank on the water front, Burlington, Vt.
- Title
- Oil Tank Construction
- Description
-
July 15, 1952. Oil tank by C. A. Congdon Construction being built on the water front, Burlington, Vt. Lake Champlain beyond with ferry crossing seen in distance.
- Title
- New England Telephone and Telegraph Co.
- Description
-
1950 construction of New England Telephone and Telegraph Co, 266 Main Street, Burlington, Vt. Back side looking toward Main Street (can see Edmunds High School building through the trees in background) Workmen seen on top of the structure along with lumber and other construction supplies.
- Title
- New England Telephone and Telegraph Co.
- Description
-
1950 construction of New England Telephone and Telegraph Co, 266 Main Street, Burlington, Vt. Back side looking toward Main Street (can see Edmunds High School building through the trees in background). Workmen seen on top of structure along with lumber and other building supplies.
- Title
- Oil Tank Construction
- Description
-
1950 landscape view of oil tank construction site. Workmen and various trucks and machinery seen.
- Title
- Burlington Streets: Institute Road
- Description
-
June 29, 1931 Institute Road construction project. This is a much earlier photo of this road than the ones dated 1946 also in the collection. A rough layer of crushed stone has been put down. A long wooden fence lining the property on the left can be seen. Telephone poles line the right.
- Title
- Burlington Streets: Institute Road
- Description
-
June 29, 1946 Institute Road - Rock Excavation Street Widening Project. This view looking westerly shows the concrete construction in progress on June 29 at the point where the fill leaves off and the rock excavation beings.
- Title
- Burlington Streets: Lakeside Ave
- Description
-
December 5, 1945. City of Burlington, Vermont, Street Department Lakeside Ave. Pavement Base Construction This view was taken from a point near the intersection of Central Ave. looking easterly toward the underpass. The new factory building just completed for the Blodgett Co. is shown with...
Show moreDecember 5, 1945. City of Burlington, Vermont, Street Department Lakeside Ave. Pavement Base Construction This view was taken from a point near the intersection of Central Ave. looking easterly toward the underpass. The new factory building just completed for the Blodgett Co. is shown with parking area base recently constructed between the street line and the building. Note the asphalt emulsion stabilized base which was mixed the previous day before taking this picture. Cold weather and frost conditions had frozen the base mixture on the left half of the street but the job was continued on the north half in spite of the low temperatures as the street had to be put in condition to receive traffic for the winter, this street being on a regular bus line. The job was continued by placing a 2 inch layer of crushed stone on this stabilized base and penetrating the same with asphalt emulsion and covering with concrete sand as a "blotter" for the winter and then opened to traffic. This project will be continued to completion in the spring by constructing an integral concrete curb and gutter on the south side of a 2 inch hot plant mix wearing surface over the entire pavement area. Note the asphalt distributor applying emulsion and the tractor and harrow mixing the base.
Show less
- Title
- Burlington Streets: Howard St.
- Description
-
November 9, 1945. Howard Street Pavement and Sidewalk Project. This view was taken at the intersection of Hayward Street looking westerly. Note the new concrete sidewalk on north side and new integral concrete curbs and gutters on both sides of pavement. The Hot Plant Mix Asphalt Wearing Surface...
Show moreNovember 9, 1945. Howard Street Pavement and Sidewalk Project. This view was taken at the intersection of Hayward Street looking westerly. Note the new concrete sidewalk on north side and new integral concrete curbs and gutters on both sides of pavement. The Hot Plant Mix Asphalt Wearing Surface was just bieng completed when this picture was taken. Grading between curb and sidewalk on North Side and in back of curb on South side was completed the following day after picture was taken. The 2 inch asphalt wearing surface was placed on a 3 inch penetration macadam with an 8 inch telford stone base. Drainage tile was laid the entire length of the street on the rear of the curbs on either side and in the center line of the street. All tile was drained with catch basins and manholes.
Show less
- Title
- Burlington Streets: Hayward St. & Hayward St. Sewer
- Description
-
January 12, 1942. Hayward Street Improvements: This view shows the drop-hammer weighing approximately 1 1/2 tons being operated by the crane to break through the frost in place of compressor and paving breakers. W.C. Kirby's power-shovel is loading the material into trucks. Three new catch basins...
Show moreJanuary 12, 1942. Hayward Street Improvements: This view shows the drop-hammer weighing approximately 1 1/2 tons being operated by the crane to break through the frost in place of compressor and paving breakers. W.C. Kirby's power-shovel is loading the material into trucks. Three new catch basins were constructed on this intersection to replace the old one.
Show less
- Title
- Burlington Streets: Hayward St. & Hayward St. Sewer
- Description
-
January 12, 1942. Hayward Street Improvements: This view shows the drop-hammer weighing approximately 1 1/2 tons being operated by the crane to break through the frost in place of compressor and paving breakers. W.C. Kirby's power-shovel is loading the material into trucks. Three new catch basins...
Show moreJanuary 12, 1942. Hayward Street Improvements: This view shows the drop-hammer weighing approximately 1 1/2 tons being operated by the crane to break through the frost in place of compressor and paving breakers. W.C. Kirby's power-shovel is loading the material into trucks. Three new catch basins were constructed on this intersection to replace the old one.
Show less
- Title
- Burlington Streets: Hayward St. & Hayward St. Sewer
- Description
-
January 12, 1942. Hayward Street Improvements: This view shows the drop-hammer weighing approximately 1 1/2 tons being operated by the crane to break through the frost in place of compressor and paving breakers. W.C. Kirby's power-shovel is loading the material into trucks. Three new catch basins...
Show moreJanuary 12, 1942. Hayward Street Improvements: This view shows the drop-hammer weighing approximately 1 1/2 tons being operated by the crane to break through the frost in place of compressor and paving breakers. W.C. Kirby's power-shovel is loading the material into trucks. Three new catch basins were constructed on this intersection to replace the old one.
Show less
- Title
- Burlington Streets: Locust St.
- Description
-
May 8, 1939. Locust Street, WPA Project No. 665-12-1-38 looking easterly from Pine Street while constructing telford base and sidewalk filling.
- Title
- Burlington Streets: Ledge Road
- Description
-
October 9, 1935 view of intersection of Route 7 (Shelburne Road or Street) and bottom of Ledge Road as it ascends up hill to the east. City street dept workmen do road or sewer construction. A dept. truck supplies power.
- Title
- Burlington Streets: Ledge Road
- Description
-
January 23, 1935. V.E.R.A. (Vermont Emergency Relief Administration) Sewer Project On upper end of Ledge Road at intersection of So. Prospect Street. Note the heavy rock excavation.
- Title
- Burlington Streets: Hayward St. & Hayward St. Sewer
- Description
-
January 12, 1942. Hayward Street Improvements: This view shows Hayward Street looking north from the intersection of Catherine Street. The old curbs and gutters have been removed and broken up for use as telford base. A 6" drain tile has been installed on either side of the street three fee below...
Show moreJanuary 12, 1942. Hayward Street Improvements: This view shows Hayward Street looking north from the intersection of Catherine Street. The old curbs and gutters have been removed and broken up for use as telford base. A 6" drain tile has been installed on either side of the street three fee below grade of top of curb and one foot back of curb. The drainage trench has been backfilled with crushed stone to within one foot of the surface. Tar paper has been spread over the crushed stone before backfilling the remainder of the trench to prevent dirt from filtering down into the stone drain. A 6" sand cushion has been placed over the clay sub-base and an 8" telford stone base has been placed by hand on the sand cushion as seen in the foreground. On this telford course has been spread approximately two inches of 1 1/2" stone which will later be given a penetration of asphalt binder. The power shovel and crane with drop hammer can be seen in the distance excavating the old pavement and sub-base at the intersection of Howard Street. Two new catch basins were constructed at the intersection of Catherine Street to replace the two old ones. More information can be found at the UVM web site Historic Burlington Project, Burlington, Vermont (South of Pearl Street photographs from 1930s 1940s).
Show less
- Title
- Burlington Streets: Hayward St. & Hayward St. Sewer
- Description
-
December 12, 1942. Hayward Street Looking Northerly from the Intersection of Catherine Street. This view shows Hayward Street looking northerly from the Catherine Street after the binder course of asphalt penetration macadam had been completed and the 2 inch asphalt hot plant mix wearing surface...
Show moreDecember 12, 1942. Hayward Street Looking Northerly from the Intersection of Catherine Street. This view shows Hayward Street looking northerly from the Catherine Street after the binder course of asphalt penetration macadam had been completed and the 2 inch asphalt hot plant mix wearing surface was being constructed. Note the date of this picture, Dec. 12, which is probably the latest date at which asphalt pavement construction of this type has ever been attempted in Vermont.
Show less
- Title
- Burlington Streets: Hayward St. & Hayward St. Sewer
- Description
-
December 9, 1942. Hayward Street Looking Northerly from the Intersection of Catherine Street. This view shows Hayward Street looking northerly from the intersection of Catherine Street. Note that the new concrete curbs have been completed, the telford stone base has also been completed and the...
Show moreDecember 9, 1942. Hayward Street Looking Northerly from the Intersection of Catherine Street. This view shows Hayward Street looking northerly from the intersection of Catherine Street. Note that the new concrete curbs have been completed, the telford stone base has also been completed and the penetration binder course of crushed stone is now being layed preparatory to penetrating with asphalt.