- Winooski Bridge Repair
- Description
-
August 24, 1945. On the Winooski Bridge with view toward Burlington and Colchester Ave. Trucks and workmen doing repair. See also mcalB22F18i01 taken moments apart from this image.
- Title
- Winooski Bridge
- Description
-
August 24, 1945. This view was taken from the Burlington end of the bridge looking northerly. Note the asphalt construction crew placing the 2 inch hot plant mix asphalt wearing surface on the westerly half of the bridge while the other half is being used for two way traffic. This wearing surface...
Show moreAugust 24, 1945. This view was taken from the Burlington end of the bridge looking northerly. Note the asphalt construction crew placing the 2 inch hot plant mix asphalt wearing surface on the westerly half of the bridge while the other half is being used for two way traffic. This wearing surface was placed 2 inches in thickness and tapered off on to the approaches at each end. The cost of this work was borne by the City of Winooski and City of Burlington sharing in the proportion of the grand list of each City and the State Highway Department. The State Highway Department paid for 4/5 of the total cost while the other fifth was divided between the two cities.
Show less
- Title
- Winooski Bridge
- Description
-
August 24, 1945. This view was taken from the Winooski end of the bridge looking toward Colchester Ave. hill. Note the completed hot plant mix wearing surface on the right half of the bridge (asphalt spreader and roller shown in the distance) while two way traffic is suing the left half of the...
Show moreAugust 24, 1945. This view was taken from the Winooski end of the bridge looking toward Colchester Ave. hill. Note the completed hot plant mix wearing surface on the right half of the bridge (asphalt spreader and roller shown in the distance) while two way traffic is suing the left half of the bridge. The crew in the left foreground is removing the old cold-patch aprons which were temporarily placed near the newly installed steel expansion lanes during the previous season. This wearing surface was placed 2 inches in thickness and tapered off on to the approaches at each end. The cost of this work was borne by the City of Winooski and City of Burlington sharing in the proportion of the grand list of each City and the State Highway Department. The State Highway Department paid for 4/5 of the total cost while the other fifth was divided between the two cities.
Show less
- Title
- Street Repair
- Date Created
- 1935-1936
- Description
-
1935 / 1936 road or street construction or repair. Wheelbarrows and plumb line seen.
- Title
- Street Repair
- Date Created
- 1935-1936
- Description
-
1935 / 1936 winter photo of workmen digging near some residential homes. Might this be a P.W.A. or W.P.A. sewer project. See also mcalB07F33i09 Construction sites for slightly different exposure.
- Title
- Street Repair
- Date Created
- 1935-1936
- Description
-
1935 / 1936 road or street construction or repair.
- Title
- Street Repair
- Date Created
- 1935-1936
- Description
-
1935 / 1936 road or street construction or repair.
- Title
- Sewer Projects (Burlington, VT)
- Date Created
- 1944-01-20
- Description
-
January 20, 1944. NORTH BEND STREET SEWER CONSTRUCTION PROJECT. This view shows the intersection of North Bend Street in front of the Pomeroy "Stone" Cottage. This project extends from the intersection of Oak Street and North Bend northerly a distance of 110 feet to the intersection shown in the...
Show moreJanuary 20, 1944. NORTH BEND STREET SEWER CONSTRUCTION PROJECT. This view shows the intersection of North Bend Street in front of the Pomeroy "Stone" Cottage. This project extends from the intersection of Oak Street and North Bend northerly a distance of 110 feet to the intersection shown in the foreground, thence easterly a distance of 167 feet to the dead-end manhole. A new manhole and two catch basins and one manhole are to be constructed at this intersection. 15 inch clay sewer tile is being used in the first section and 10 inch clay sewer tile is being used in the second section. This installation will take care of the surface drainage which here-to-fore has overflowed down over the bank to the left, into the Intervale, but because of the new road now leading to the Refuse Disposal Grounds, this surface water would create severe damage to the road and adjoining banks. Note also the catch basin being constructed at the intersection of North Bend Street and Walnut Street shown in the background. The frost on this date was approximately 4 feet in depth.
Show less
- Title
- Sewer Projects (Burlington, VT)
- Date Created
- 1935-10-09
- Description
-
October 9, 1935 view of intersection of Route 7 (Shelburne Road or Street) and bottom of Ledge Road as it ascends up hill to the east. City street dept workmen do road or sewer construction. A dept. truck supplies power.
- Title
- Road Construction
- Description
-
Undated photograph of a group of workers posing at a construction site on an unknown Burlington Street
- Title
- Road Construction
- Description
-
View of a road under reconstruction. The dirt surface has loose rocks. A manhole is seen in the middle of the road foreground. Men, machines and automobiles in the distance.
- Title
- Road Construction
- Description
-
A road crew at work on an unidentified Burlington street.
- Title
- Road Construction
- Description
-
September 10, 1928. Crew members work with a tank truck pouring and smoothing road surface on a strip of road.
- Title
- Road Construction
- Description
-
March 6, 1934. City Burlington, Vermont. CWA (Civil Works Administration) Project #402-J. Telford stone base construction and crushed stone surface. Note winter conditions. Wished someone had noted the location.
- Title
- Road Construction
- Description
-
Undated photo of road work crew laying surface material.
- Title
- Road Construction
- Description
-
A road crew and their heavy equipment at work on an unidentified Burlington street.
- Title
- Road Construction
- Description
-
September 10, 1928. Road crew and a huge machine work along a stretch of road. Dozens of cloth bags containing construction material are seen lined up. Billboards in the distance advertise Atwater Kent radios, Graham Paige and a fuel company for coal and oil.
- Title
- Road Construction
- Description
-
December 7, 1938. Road construction crew repaves a city street as part of the P. W. A. Federal Emergency Administration of Public Works street improvements. Project No. VT 1097-F.
- Title
- Road Construction
- Description
-
A steamroller in operation during a paving project on an unidentified Burlington street.
- Title
- Road Construction
- Description
-
Undated photograph taken at the start of the blasting project on the hill located just north of Institute Road on North Avenue.