Search results
(1 - 20 of 55)
Pages
- Title
- Burlington Streets: Main Street (Upper)
- Description
-
April 20, 1938 view of Main Street from South Union to South Willard Street, WPA Project 465-12-1-16 This view shows the construction work after all excavation of the old pavement had been made and sand cushion with telford stone base had been nearly completed; also crushed stone base placed on...
Show moreApril 20, 1938 view of Main Street from South Union to South Willard Street, WPA Project 465-12-1-16 This view shows the construction work after all excavation of the old pavement had been made and sand cushion with telford stone base had been nearly completed; also crushed stone base placed on the telford on the south half of the street. To the extreme right is seen a corner of the Edmunds High School building (Burlington High School).
Show less
- Title
- Burlington Streets: North Ave
- Description
-
Original caption reads: North Avenue Street Widening Project, WPA No. 65-12-336 looking North from a point opposite Lake View Cemetery residence. Note telford base nearly completed on west shoulder with crushed stone for penetration course in place. East shoulder approximately one-half excavated...
Show moreOriginal caption reads: North Avenue Street Widening Project, WPA No. 65-12-336 looking North from a point opposite Lake View Cemetery residence. Note telford base nearly completed on west shoulder with crushed stone for penetration course in place. East shoulder approximately one-half excavated with Telford Base and chestnut stone in place.
Show less
- Title
- Burlington Streets: North Ave
- Description
-
Photograph dated Feb. 23, 1940. Original caption reads: WPA Project No. 655-12-2-62. This view shows the construction of the North End Sewer in front of the George Farrington [1106 North Ave.] and the Ralph Thayer [1076 North Ave.] residence opposite the entrance to the Burlington Rendering...
Show morePhotograph dated Feb. 23, 1940. Original caption reads: WPA Project No. 655-12-2-62. This view shows the construction of the North End Sewer in front of the George Farrington [1106 North Ave.] and the Ralph Thayer [1076 North Ave.] residence opposite the entrance to the Burlington Rendering Company's plant. This section of the project is a 15" sewer being constructed entirely with hand labor, using sledge hammers and wedges for excavating through the frost. The Universal Crane used for pulling sheeting and handling materials on the job can be seen in the distance where the excavator is being used for installing the 18" pipe. The depth of the sewer at this location is approximately 12-13 feet.
Show less
- Title
- Burlington Streets: Battery Street Park
- Description
-
1938-1940 photograph of the south entrance to Battery Park (after completion of WPA [Work Projects Administration] project?) Note new light poles, widened road and the completed parapet wall.
- Title
- Burlington Streets: Battery Street Park
- Description
-
Photograph of Battery Park dated July 11, 1938 looking north toward the look-off. Note completed parapet wall and new light poles. Probably Work Projects Administration project.
- Title
- Burlington Streets: Bradley Road
- Description
-
Photograph dated Oct. 17, 1941. Original caption reads: Bradley Road Sewer: This view is taken from a point near the intersection of North Avenue looking easterly toward the Poor Farm. This picture was taken after the North End Sewer construction had been completed and numerous large and small...
Show morePhotograph dated Oct. 17, 1941. Original caption reads: Bradley Road Sewer: This view is taken from a point near the intersection of North Avenue looking easterly toward the Poor Farm. This picture was taken after the North End Sewer construction had been completed and numerous large and small pine trees had been eliminated on the southerly side of the street as well as some excavation as shown in the right foreground bordering Ethan Allen Park. Note that the electric light and telephone pole line has been removed and established on the northerly side of the street parallel to the centerline. A sidewalk has been petitioned to be constructed on the northerly side (left hand) of this street which can be readily seen will require the removal of several trees if constructed in the regular location, one foot from the street line. A WPA project was proposed for regrading, widening and generally improving the street but owing to lack of WPA men because of War Defense work this project will be postponed indefinitely.
Show less
- Title
- Burlington Streets: Grove St.
- Description
-
Photograph dated July 27, 1938. View of the construction project at the site of the new Grove Street bridge (WPA [Work Projects Administration] Grove Street Bridge, Project No. 465-12-1-15). Direction unknown but is from the opposite of the street seen in photograph no.8.
- Title
- Burlington Streets: Battery Street Park
- Description
-
Photograph dated June 3, 1938, Original caption reads: Battery Park - WPA (Work Projects Administration) Project No. 65-12-344 This view shows the construction of the stone masonry parapet wall with the reinforced concrete caps. Note the first concrete cap being polished after removing the forms...
Show morePhotograph dated June 3, 1938, Original caption reads: Battery Park - WPA (Work Projects Administration) Project No. 65-12-344 This view shows the construction of the stone masonry parapet wall with the reinforced concrete caps. Note the first concrete cap being polished after removing the forms also the reinforced materials in the right foreground in reinforcing the caps also the special forms used in pouring the concrete caps.
Show less
- Title
- Burlington Streets: North Ave
- Description
-
Original caption reads: North Avenue Street Widening Project, WPA No. 65-12-336 looking South from intersection of Institute Road. Note telfold base nearly completed on west shoulder with crushed stone for penetration course in place. East shoulder approximately one-half excavated with Telfold...
Show moreOriginal caption reads: North Avenue Street Widening Project, WPA No. 65-12-336 looking South from intersection of Institute Road. Note telfold base nearly completed on west shoulder with crushed stone for penetration course in place. East shoulder approximately one-half excavated with Telfold Base and chestnut stone in place.
Show less
- Title
- Ethan Allen Park, Burlington
- Description
-
Original caption reads: This is a view of the building built under WPA Project No. 65-12-344 at Ethan Allen Park to be used as a combination tool house and toilet for ladies and gentlemen. Modern plumbing has been installed in the toilets with a large cesspool for sewage disposal which can later...
Show moreOriginal caption reads: This is a view of the building built under WPA Project No. 65-12-344 at Ethan Allen Park to be used as a combination tool house and toilet for ladies and gentlemen. Modern plumbing has been installed in the toilets with a large cesspool for sewage disposal which can later be connected with the proposed sewer to be built on Bradley Road. This building is erected near the picnic grounds in the Pine Grove.
Show less
- Title
- Burlington Streets: Grove St.
- Description
-
Photograph dated Nov. 21, 1940. Original caption reads: WPA (Work Projects Administration) Project No. 665-12-1-38 This view is shows the improvements on Grove Street looking in the opposite direction from the view shown in the previous picture.
- Title
- Burlington Streets: Grove St.
- Description
-
Photograph is dated Aug. 15, 1939. Original caption reads: WPA [Work Projects Administration] Street Paving Project No. 665-12-2-38(Grove Street) This view shows Grove Street pavement project looking northerly from the Grove Street Bridge after the westerly half of the pavement had been completed...
Show morePhotograph is dated Aug. 15, 1939. Original caption reads: WPA [Work Projects Administration] Street Paving Project No. 665-12-2-38(Grove Street) This view shows Grove Street pavement project looking northerly from the Grove Street Bridge after the westerly half of the pavement had been completed. Note the trench at the left where perforated corrugated metal pipe is being installed for underground drainage purposes.
Show less
- Title
- Burlington Streets: Grove St.
- Description
-
Photograph dated Nov. 21, 1940. Original caption reads: WPA (Work Projects Administration) Project No. 665-12-1-38 This view is shows the completed project in the area adjacent to the bridge on Grove Street looking in a northerly direction from a point opposite the entrance to the W.C. Kirby...
Show morePhotograph dated Nov. 21, 1940. Original caption reads: WPA (Work Projects Administration) Project No. 665-12-1-38 This view is shows the completed project in the area adjacent to the bridge on Grove Street looking in a northerly direction from a point opposite the entrance to the W.C. Kirby Garage. Note the easy back slope on the shoulders of the excavated portion of the improvement in the background; also the stone dust surfacing of the sidewalks on both sides of the street as well as the asphalt armor coat surface on the pavement.
Show less
- Title
- Burlington Streets: Winooski Ave.
- Description
-
August 15, 1939. So. Winooski Ave. looking south from intersection of Main Street after Plant-Mix asphalt pavement with an average of one and one-half inches of hot asphalt binder course or leveling course and two inch wearing surface of American Bitumuls laykold mixture had been placed and the...
Show moreAugust 15, 1939. So. Winooski Ave. looking south from intersection of Main Street after Plant-Mix asphalt pavement with an average of one and one-half inches of hot asphalt binder course or leveling course and two inch wearing surface of American Bitumuls laykold mixture had been placed and the street opened to traffic. Sign to the left near a two story billboard structure states P.W.A. Federal Works Agency Public Works Administration Street Improvements. Billboards advertise Ritz Crackers and Chesterfield Cigarettes. Strong building on the corner to the right.
Show less
- Title
- Burlington Streets: Battery Street Park
- Description
-
1938-1940 photograph of Battery Park. Original caption reads: WPA (Work Projects Administration) 65-12-344 View of the asphalt plant mix binder. Coarse on sidewalk and concrete base for parapet wall in Battery Park. Note excavation for concrete integral curb and gutter at right.
- Title
- Burlington Streets: Grove St.
- Description
-
Photograph is dated Aug. 15, 1939. Original caption reads: WPA [Work Projects Administration] Street Paving Project No. 665-12-2-38(Grove Street) This view shows Grove Street pavement project looking southerly from the extreme northerly end of the job showing the partially completed base and base...
Show morePhotograph is dated Aug. 15, 1939. Original caption reads: WPA [Work Projects Administration] Street Paving Project No. 665-12-2-38(Grove Street) This view shows Grove Street pavement project looking southerly from the extreme northerly end of the job showing the partially completed base and base leveling course; also quarry operations where stone rubble is being prepared for the construction of the telford stone base.
Show less
- Title
- Burlington Streets: Grove St.
- Description
-
Photograph dated Feb. 3, 1940. Original caption reads: WPA (Work Projects Administration) Project No. 665-12-1-38 This view is shows the completed project in the area adjacent to the bridge on Grove Street looking in a northerly direction from a point opposite the entrance to the W.C. Kirby...
Show morePhotograph dated Feb. 3, 1940. Original caption reads: WPA (Work Projects Administration) Project No. 665-12-1-38 This view is shows the completed project in the area adjacent to the bridge on Grove Street looking in a northerly direction from a point opposite the entrance to the W.C. Kirby Garage. Note the easy back slope on the shoulders of the excavated portion of the improvement in the background; also the stone dust surfacing of the sidewalks on both sides of the street as well as the asphalt armor coat surface on the pavement.
Show less
- Title
- Burlington Streets: Battery Street Park
- Description
-
1938-1940 photograph of the south entrance to Battery Park with WPA (Work Projects Administration) Project sign. Note the old light poles and that southern portion of the parapet wall has not yet been built.
- Title
- Burlington Streets: Pine St.
- Description
-
February 23, 1940. WPA Project No. 665-12-1-38, Street Improvements - Pine Street This view shows the excavation practically completed on Pine Street between Flynn Ave and Ferguson Ave ready for the sand cushion and telfold base. Some of this excavation is being done by hand labor using wedges...
Show moreFebruary 23, 1940. WPA Project No. 665-12-1-38, Street Improvements - Pine Street This view shows the excavation practically completed on Pine Street between Flynn Ave and Ferguson Ave ready for the sand cushion and telfold base. Some of this excavation is being done by hand labor using wedges and sledge hammers as shown in the foreground and the remainder is being done with the aid of Paving Breakers and a No. 105 Ingersol-Rand Air compressor. Excavation on this block was from 20"-24" in depth in hard frost, the frost going to a depth of approximately five feet. St. Anthony's Church seen to the left.
Show less
- Title
- Burlington Streets: Grove St.
- Description
-
Photograph dated July 27, 1938. View of the construction project at the site of the new Grove Street bridge (WPA [Work Projects Administration] Grove Street Bridge, Project No. 465-12-1-15). Direction unknown but is from the opposite of the street seen in photograph no.9.