Members of Phi Delta Theta fraternity, with house at 439 College St., Burlington, Vt. (same group as in mcalB19F28i01). This photo appears on p.136 of the 1953 Ariel, the UVM student yearbook. Photo #12.
- Title
- Surveyors
- Description
-
December 20, 1932. Stadia survey party while on survey for city map and topography for sewer and drainage system in North portion of city.
- Title
- Streets, Roads: Unidentified
- Description
-
October 7, 1946. Institute Road Rock Excavation Street Widening Project showing new sidewalk construction work done by the city street dept. See also mcalA05F07i12
- Title
- Street Repair
- Date Created
- 1943-06-25
- Description
-
June 25, 1943. Trolley track rail removal project. Church Street retail stores seen to the left include Hayes and Carney Men's Clothes, Western Union office.
- Title
- Street Repair
- Date Created
- 1943
- Description
-
Salvage Project. Trolley track Rail Removal Project, Burlington, Vermont. This view taken in front of Burlington City Hall (right) while the last rail was being pulled on June 25, 1943, shows the special rail pulling equipment including the device for the "rolling pull" on the rail shown at the...
Show moreSalvage Project. Trolley track Rail Removal Project, Burlington, Vermont. This view taken in front of Burlington City Hall (right) while the last rail was being pulled on June 25, 1943, shows the special rail pulling equipment including the device for the "rolling pull" on the rail shown at the end of the "A" frame. See also mcalA04F04i12
Show less
- Title
- Street Repair
- Date Created
- 1943-06-25
- Description
-
June 25, 1943. Trolley track rail removal project. Church Street retail stores seen to the right include Hayes and Carney Men's Clothes, Western Union office, City Hall (distant right) See also mcalA04F05i07 and mcalA04F05i05 (with note "reshot")
- Title
- Sewer Projects (Burlington, VT)
- Date Created
- 1944-01-20
- Description
-
January 20, 1944. NORTH BEND STREET SEWER CONSTRUCTION PROJECT. This view shows the intersection of North Bend Street in front of the Pomeroy "Stone" Cottage. This project extends from the intersection of Oak Street and North Bend northerly a distance of 110 feet to the intersection shown in the...
Show moreJanuary 20, 1944. NORTH BEND STREET SEWER CONSTRUCTION PROJECT. This view shows the intersection of North Bend Street in front of the Pomeroy "Stone" Cottage. This project extends from the intersection of Oak Street and North Bend northerly a distance of 110 feet to the intersection shown in the foreground, thence easterly a distance of 167 feet to the dead-end manhole. A new manhole and two catch basins and one manhole are to be constructed at this intersection. 15 inch clay sewer tile is being used in the first section and 10 inch clay sewer tile is being used in the second section. This installation will take care of the surface drainage which here-to-fore has overflowed down over the bank to the left, into the Intervale, but because of the new road now leading to the Refuse Disposal Grounds, this surface water would create severe damage to the road and adjoining banks. Note also the catch basin being constructed at the intersection of North Bend Street and Walnut Street shown in the background. The frost on this date was approximately 4 feet in depth.
Show less
- Title
- Sewer Projects (Burlington, VT)
- Date Created
- 1935-10-09
- Description
-
October 9, 1935 view of intersection of Route 7 (Shelburne Road or Street) and bottom of Ledge Road as it ascends up hill to the east. City street dept workmen do road or sewer construction. A dept. truck supplies power.
- Title
- Sewer Projects (Burlington, VT)
- Date Created
- 1935-10-09
- Description
-
October 9, 1935 view of intersection of Route 7 (Shelburne Road or Street) and bottom of Ledge Road as it ascends up hill to the east. City street dept workmen do road or sewer construction. A dept. truck supplies power.
- Title
- Sewer Projects (4X5)
- Description
-
March 5, 1937. Laying pipe at a sewer project site.
- Title
- Sewer Projects (4X5)
- Description
-
May 2, 1934. South End Sewer Project. Docket No. 2353. Burlington, Vermont. Crew members work in a narrow and deep trench at the project site.
- Title
- Sewer Projects (4X5)
- Description
-
June 1932. View of a wide trench down the middle of the street at a sewer project site. Wooden timber structures are seen in the trench. Photo printed backwards as the date is seen written backwards in the lower left corner.
- Title
- Sewer Projects (4X5)
- Description
-
April 20, 1934. South End Sewer Project. Docket No. 2353. Burlington, Vermont. A wooden sign identifies this project as part of the Federal Public Works. View of a very narrow trench in which one worker holds a jackhammer. A line of rocks are seen topside to the left.
- Title
- Sewer Projects (4X5)
- Date Created
- 1932-04-25
- Description
-
April 25, 1932. A Rutland Railroad steam engine spans a construction area of a sewer project near the water front in Burlington. See also mcalA16F12i19
- Title
- Sewer Projects (4X5)
- Description
-
March 5, 1937. View of a long narrow trench with a manhole seen in the forefront. Timbers span the trench and workmen are in the background laying pipe at this sewer project site.
- Title
- Sewer Projects
- Description
-
April 24, 1931. View of a long dry narrow trench as it stretches on pass some residential homes (seen at upper right) at this sewer project site.
- Title
- Sewer Projects
- Description
-
View of a deep rocky trench and crew members manipulating a long timber across a wooden plank overpass. Hoses and other equipment seen in this wooded sewer project site.
- Title
- Sewer Projects
- Description
-
June 1929. Three crew members (and several young boys in the back) are at the sewer project site where a break is in the ravine sewer made by pressure from an exceptional rain storm. Note the clay brick (tile) construction of the damaged pipe and the new metal pipes piled up in back. See also...
Show moreJune 1929. Three crew members (and several young boys in the back) are at the sewer project site where a break is in the ravine sewer made by pressure from an exceptional rain storm. Note the clay brick (tile) construction of the damaged pipe and the new metal pipes piled up in back. See also mcalA16F13i32
Show less
- Title
- Sewer Projects
- Description
-
February 23, 1940. This view shows the construction of the North End Sewer in front of the George Farrington and the Ralph Thayer residence opposite the entrance to the Burlington Rendering Company's plant. This section of the project is a 15" sewer being constructed entirely with hand labor,...
Show moreFebruary 23, 1940. This view shows the construction of the North End Sewer in front of the George Farrington and the Ralph Thayer residence opposite the entrance to the Burlington Rendering Company's plant. This section of the project is a 15" sewer being constructed entirely with hand labor, using sledge hammers and wedges for excavating through the frost. The Universal Crane used for pulling sheeting and handling materials on the job can be seen in the distance where the excavator is being used for installing the 18" pipe. The depth of the sewer at this location is approximately 12 to 13 feet.
Show less
- Title
- Sewer Projects
- Description
-
March 5, 1937. View of a long narrow trench with a manhold seen in the foreground. Long timbers span the trench all down the line.